Moving Guides · Preparing household appliances
Moving a washing machine: preparation checklist
Find the right transport locks, agree who prepares the appliance and leave a clear handover for reconnection. Start with the instructions for your exact model.
By Smoover · Reviewed 26 October 2026

Prepare a washing machine for the move before the loading team arrives. Find its model instructions, arrange the specified transport restraints, plan disconnection and residual-water removal, and agree on an upright transport plan. At the destination, the person reconnecting it needs to know which restraints must come out before use. Keep preparation, transport and reconnection as three explicit tasks.
Find the model and the correct transport locks
Start with a photograph of the appliance’s model identification and a saved copy of its installation instructions. Use the manufacturer’s manual search or support team if the original booklet is missing. A photograph of the front panel alone may not identify the exact variant.
AEG’s front-loader guidance says to reinstall the transport screws for a move, obtain replacements if missing and remove them before operation. The correct parts and fitting procedure belong to the model instructions; do not copy another appliance’s bolt count.
Some machines use a different arrangement. For example, Miele manual M.-Nr. 10 654 210, pages 73–75 describes transport rods and requires the restraint to be refitted before transport. That is an example of why a generic set of bolts is not a model-specific answer.
If a required part cannot be found, leave the preparation status open and ask the manufacturer and your mover how to proceed. Do not treat padding in the drum or careful driving as confirmation that the specified restraint is unnecessary.
Assign preparation before packing the laundry room
Write down who will prepare the appliance and when it must be ready. A booking for carrying furniture does not, by itself, tell everyone who will disconnect plumbing, fit transport parts or reconnect the machine. Put the agreed services into the moving plan and quote.
Use these planning checkpoints with the responsible person:
- Last use: schedule the final wash so the appliance is available for preparation rather than still running at collection time.
- Instructions: identify the sections covering disconnection, draining, transport restraints and recommissioning. Keep them available offline.
- Connections: confirm that the shut-off point, plug and hoses can be reached without dismantling fitted furniture unexpectedly.
- Water and parts: agree who follows the manual’s residual-water procedure and keeps detached accessories together.
- Readiness: record what has actually been completed, who checked it and anything still unresolved.
Residual water deserves its own check. The Miele manual above warns about hot wash water during draining. Follow your model’s procedure and cooling precautions rather than opening a filter immediately after a hot cycle. If a valve is stuck, a connection is damaged or the instructions are unclear, arrange appropriate technical help before collection.
Photograph the existing connections for your own records and label the parts pouch with the appliance reference. Keep the manual and small parts accessible; an unmarked bag at the bottom of a sealed carton is difficult to find when the machine reaches the new home.
Plan an upright journey and check both access routes
Bosch’s moving guidance recommends upright transport and secure strapping when using an appliance trolley. Confirm the handling and vehicle plan with the mover. A tight boot or stair turn is a reason to rethink access, not to improvise a carrying method.
Walk the full route from the current position to the loading point, then check the route into the new laundry space. Record door openings, turns, steps, lift access and the final position. Include photographs of awkward points in the moving inventory, with enough context to show the approach.
For example, a machine may fit the bathroom doorway but have no turning room beside a fixed cabinet. Mark that as an unresolved access point rather than recording only the doorway width. Ask the mover what further measurements or preparation are needed before the day.
Keep doors, landings and the agreed loading route clear. Use our no-parking-zone guide to plan access at the kerb and our fridge-moving checklist for a separate appliance that needs its own preparation.
Copy this appliance handover sheet
Make one sheet for the washing machine and share it with the people responsible for the move. The aim is to distinguish “transported” from “ready to use”. This is a planning template, not evidence that a service has been booked.
| Item | Record before collection | Keep open until |
|---|---|---|
| Appliance identity | Model reference, manual location and destination room | The same appliance and instructions are identified at arrival |
| Preparation owner | Name, agreed tasks and completion time | The actual preparation status is confirmed |
| Transport restraints | Required parts, fitting responsibility and check status | Removal before use is assigned at the destination |
| Loose parts | Pouch label, contents and where it travels | The receiving person has the parts |
| Access | Both floors, lift details, tight turns and open questions | The mover confirms the handling plan |
| Reconnection | Responsible person, agreed appointment and remaining checks | Installation and the prescribed initial checks are completed |
Add a final note: “Not yet ready for use” if reconnection is pending. A key handover or signed delivery record should not leave a housemate guessing whether the machine has been commissioned.

Complete reconnection before the first wash
Give the receiving person the manual, parts pouch and handover sheet. Confirm that the transport restraints have been removed as instructed before the appliance is operated. Keep them for a future move rather than throwing them away with packaging.
Record the installation checks required by the manufacturer, including positioning, connections and any prescribed initial procedure. Do not assume that a familiar-looking connection at the new home makes every detail identical. A built-under or stacked appliance needs its own installation plan.
If the machine leaks, moves unexpectedly or produces an unfamiliar fault during the initial check, stop using it and arrange the appropriate support. Note what happened for the responsible installer instead of trying repeated wash cycles to see whether the problem disappears.
Our flat-handover checklist helps you keep appliance arrangements alongside the other tasks at the old and new home.
Questions about moving a washing machine
Can I move it without the transport locks?
Check the exact model instructions. If the required restraints are missing, get the manufacturer’s advice and suitable replacements before agreeing that the appliance is ready. There is no universal safe workaround in this checklist.
Can the washing machine travel lying down?
Plan for upright transport and tell the mover about any access or vehicle constraint. Check the model instructions before accepting a different position; do not assume a short journey removes the appliance’s transport requirements.
Does a moving quote automatically include reconnection?
Ask for preparation, carrying and reconnection to be listed separately in the agreed scope. The person receiving the machine should know whether it is ready to use or still needs an appointment.
Include the washing machine in your moving plan
Send Smoover your inventory, moving date and access details for a fixed-price offer. Identify any preparation or connection work you want included so the agreed responsibilities are clear before moving day.
Request my moving quoteMore tips are in our moving guides. To see what we offer besides transport, have a look at our moving services.
Sources and review
Reviewed 26 October 2026 against the linked Bosch moving guidance, AEG front-loader support article and the identified Miele model manual. The handover sheet and planning examples are original tools. These sources do not replace the instructions for your own appliance.